Insulation Coordination Study
PSCAD-based evaluation of transient overvoltages from lightning, switching and faults to ensure standards-compliant insulation design.

What we do
Our Insulation Coordination Study using PSCAD evaluates transient overvoltages caused by lightning strikes, switching operations, and fault conditions to ensure adequate insulation levels and reliable system protection. Through detailed electromagnetic transient simulations, the study assesses equipment withstand capability, surge arrester performance, insulation stress, and overvoltage propagation. The analysis helps optimize insulation design, minimize the risk of insulation failure, improve system reliability, and ensure compliance with IEC 60071 and utility-specific requirements.
Deliverables & analysis
Transmission Systems, Substations, Power Plants, Renewable Energy Projects, Oil & Gas Facilities, and Industrial Power Systems — ensuring safe, reliable, and standards-compliant operation under transient overvoltage conditions.
Ready to engineer a more reliable power system?
From load flow to arc flash, from single-line diagrams to full training programs — talk to an engineer, not a salesperson.
Request a Consultation